Token导航 LogoToken导航TokenDH.com
研究检索需要联网github未标认证来源可访问许可证需确认审计提醒

ln-820-dependency-optimization-coordinatorln 820 依赖优化协调器

Agent Skill

ln-820-dependency-optimization-coordinator 用于查找、检索和筛选相关信息,适合在 Codex、Claude、Cursor、Gemini CLI 中需要根据关键词、任务场景或来源线索快速定位候选结果时使用。可结合来源仓库、安装命令和原始 README 继续核验具体用法。安装前建议确认权限范围、维护状态,以及是否会触发联网、命令执行或文件读写。

总安装

3,288

周安装

133

GitHub Stars

441

下载量

1,032
CodexClaudeCursorGemini CLI

安装说明

本站只整理中文说明和来源信息,不托管安装包,也不代用户安装。

GitHub

来源数

2

许可证

unknown

最后核验

2026-05-01

来源状态

来源可访问

安装方式

通过对话安装

复制提示词发给支持本地命令或 Skills 的 AI 助手,先确认命令和权限,再让它执行。

请帮我安装这个 Agent Skill:ln-820-dependency-optimization-coordinator(ln 820 依赖优化协调器)
来源仓库:https://github.com/levnikolaevich/claude-code-skills
仓库路径:skills/ln-820-dependency-optimization-coordinator
安装命令:
npx skills add https://github.com/levnikolaevich/claude-code-skills --skill ln-820-dependency-optimization-coordinator
安装前请先检查当前环境是否支持对应 CLI,并向我确认将要执行的命令、安装目录、联网范围和文件读写权限;确认后再执行。

命令行安装

复制命令到本机终端执行。该命令会通过 npx skills 从第三方来源获取 Skill;本站只展示命令,不托管安装包,也不自动执行。

skills.shnpx skills
npx skills add https://github.com/levnikolaevich/claude-code-skills --skill ln-820-dependency-optimization-coordinator

简介

用于项目依赖项的安全审计与版本升级优化。

  • 支持 Node.js、Python 等多种包管理器检测与安全检查。
  • 确保依赖更新符合安全策略和发布年龄要求。
  • 安装前建议确认权限范围、维护状态及是否触发构建验证操作。
  • ln-820-dependency-optimization-coordinator 属于研究检索类 Skill,可作为该场景下的辅助能力补充。

SKILL.md

Paths: File paths (shared/, references/, ../ln-*) are relative to skills repo root. If not found at CWD, locate this SKILL.md directory and go up one level for repo root. If shared/ is missing, fetch files via WebFetch from https://raw.githubusercontent.com/levnikolaevich/claude-code-skills/master/skills/{path}.

ln-820-dependency-optimization-coordinator

Type: L2 Domain Coordinator Category: 8XX Optimization

Runtime-backed coordinator for cross-stack dependency upgrades. Detects package managers, delegates to one worker per manager, records machine-readable worker summaries, and emits a final coordinator summary.


Overview

AspectDetails
InputProject path plus optional upgrade policy
OutputAggregated dependency upgrade report with per-worker results
Workersln-821 (npm), ln-822 (nuget), ln-823 (pip)
Runtime.hex-skills/dependency/runtime/runs/{run_id}/

Workflow

Phases: Pre-flight -> Detect Package Managers -> Security Audit -> Delegate Upgrades -> Collect Results -> Verify Summary -> Report


Runtime Contract

MANDATORY READ: Load shared/references/ci_tool_detection.md MANDATORY READ: Load shared/references/coordinator_runtime_contract.md, shared/references/dependency_runtime_contract.md, shared/references/coordinator_summary_contract.md

Runtime CLI:

node shared/scripts/dependency-runtime/cli.mjs start --identifier repo-deps --manifest-file <file>
node shared/scripts/dependency-runtime/cli.mjs status --identifier repo-deps
node shared/scripts/dependency-runtime/cli.mjs checkpoint --phase PHASE_3_DELEGATE_UPGRADES --payload '{...}'
node shared/scripts/dependency-runtime/cli.mjs record-worker-result --payload '{...}'
node shared/scripts/dependency-runtime/cli.mjs record-summary --payload '{...}'
node shared/scripts/dependency-runtime/cli.mjs advance --to PHASE_4_COLLECT_RESULTS
node shared/scripts/dependency-runtime/cli.mjs complete

Required state fields:

  • worker_plan
  • worker_results
  • child_runs
  • verification_passed
  • report_ready
  • summary_recorded

Domain checkpoints:

  • PHASE_1_DETECT_PACKAGE_MANAGERS: detected managers, indicator files, skipped managers
  • PHASE_2_SECURITY_AUDIT: per-manager audit verdicts, blocking findings, release-age policy
  • PHASE_3_DELEGATE_UPGRADES: one child_run per delegated worker with worker name, identifier, runId, and summaryArtifactPath
  • PHASE_4_COLLECT_RESULTS: recorded worker summaries plus unresolved failures or warnings
  • PHASE_5_VERIFY_SUMMARY: final report path, verification verdict, summary readiness

Guard rules:

  • do not advance from PHASE_3_DELEGATE_UPGRADES until every planned worker emitted a valid dependency-worker summary
  • do not complete until the final report checkpoint exists and the dependency-coordinator summary was recorded
  • consume worker JSON summaries only; never infer worker status from prose output

Phase 0: Pre-flight

Confirm the project is a valid candidate for dependency work before starting the runtime.

CheckMethodBlock if
Manifest existsRuntime start validationMissing
Project path existsFile inspectionMissing
Upgrade policy providedManifest or defaultsNo
Existing active run for identifierRuntime active pointerConflicting active run

Default options:

OptionDefaultMeaning
upgradeTypemajormajor, minor, or patch
allowBreakingtrueallow major-version migrations
minimumReleaseAge14skip very recent releases unless security requires them
testAfterUpgradetrueworkers verify build/tests after changes

Phase 1: Detect Package Managers

Detect one worker target per package-manager family.

Package ManagerIndicator FilesWorker
npmpackage.json + package-lock.jsonln-821
yarnpackage.json + yarn.lockln-821
pnpmpackage.json + pnpm-lock.yamlln-821
nuget*.csproj or *.slnln-822
piprequirements.txtln-823
poetrypyproject.toml + poetry.lockln-823
pipenvPipfile + Pipfile.lockln-823

Checkpoint payload must include:

  • detected_managers
  • indicator_paths
  • worker_plan
  • skipped_reasons

Phase 2: Security Audit

Perform lightweight pre-flight security and freshness checks before delegating heavy upgrade work.

Manager FamilyCommandBlock Condition
Node.jsnpm audit --audit-level=high or manager equivalentCritical vulnerability with no allowed override
NuGetdotnet list package --vulnerableCritical vulnerability with no allowed override
Pythonpip-audit --json or manager equivalentCritical vulnerability with no allowed override

Release-age gate:

OptionDefaultDescription
minimumReleaseAge14 daysSkip packages released too recently
ignoreReleaseAgefalseOverride for urgent security patches

Checkpoint payload must include:

  • audit_results
  • blocking_findings
  • release_age_policy
  • managers_cleared_for_delegation

Phase 3: Delegate Upgrades

Delegate one child run per worker family. Child runs must be deterministic and artifact-driven.

Delegate using the concrete worker identities selected by the routing table below. Do not synthesize family placeholders or guessed skill IDs in prompts.

Delegation context:

FieldTypeDescription
projectPathstringAbsolute path to target project
packageManagerenumnpm, yarn, pnpm, nuget, pip, poetry, pipenv
identifierstringStable worker identifier inside the run
runIdstringDeterministic child run id
summaryArtifactPathstringExact JSON path for the worker summary
optionsobjectUpgrade policy, verification flags, safety flags

Worker selection:

Manager FamilyWorkerNotes
npm, yarn, pnpmln-821-npm-upgraderOne child run per detected Node manager
nugetln-822-nuget-upgraderOne child run for.NET
pip, poetry, pipenvln-823-pip-upgraderOne child run per detected Python manager

After launching each worker:

  1. Checkpoint child_run under PHASE_3_DELEGATE_UPGRADES.
  2. Wait for the emitted dependency-worker summary envelope.
  3. Record the worker summary with record-worker-result.

Phase 4: Collect Results

Aggregate validated worker summaries only.

Worker summary fields consumed by the coordinator:

FieldDescription
producer_skillworker identity (ln-821, ln-822, ln-823)
summary_kindmust be dependency-worker
identifierstable worker identifier
payload.statuscompleted, partial, or failed
payload.upgradesapplied upgrades with before/after versions
payload.warningsnon-blocking issues
payload.verificationbuild/test verification result
payload.artifact_pathworker-owned durable report path, if any

Collection output:

  • worker_results
  • success_count
  • partial_count
  • failed_count
  • blocking_failures

Phase 5: Verify Summary

Prepare the final durable report and verify the coordinator can finish deterministically.

Verification checklist:

  • every planned worker produced one valid summary envelope
  • aggregate counts match recorded worker results
  • final report path exists or is ready to be written
  • report_ready and verification_passed are true before completion

Failure handling:

  1. Keep successful worker results intact.
  2. Mark failed workers explicitly in the coordinator report.
  3. Do not invent rollback actions beyond what workers already verified.

Phase 6: Report

Coordinator report schema:

FieldDescription
package_managersdetected managers handled in this run
workers_activateddelegated workers
total_packagespackages analyzed across workers
upgradedsuccessful upgrades
skippedalready latest or policy-skipped packages
failedpackages or worker runs that failed
breaking_changesmajor-version upgrades or migrations
verification_passedaggregate verification verdict
per_worker[]machine-readable worker result summaries
warnings[]cross-worker warnings

Completion sequence:

  1. Write the durable report.
  2. Checkpoint the report path and verification verdict.
  3. Record the dependency-coordinator summary envelope with record-summary.
  4. Complete runtime only after the report checkpoint and coordinator summary exist.

Configuration

Options:
  upgradeType: major          # major | minor | patch
  allowBreaking: true
  minimumReleaseAge: 14
  auditLevel: high            # none | low | moderate | high | critical
  testAfterUpgrade: true
  buildAfterUpgrade: true
  rollbackOnFailure: true
  skipDev: false
  skipOptional: true

Error Handling

Recoverable:

ErrorRecovery
Peer dependency conflictKeep worker result as partial, continue collecting
Build failure in one workerPreserve failure, continue other workers
Network timeoutWorker retries locally, then reports failure

Fatal:

ErrorAction
No package managers foundFinish with empty-result report
Runtime validation failurePause run and require intervention
Missing worker summary for planned child runDo not advance from collection

References


TodoWrite format (mandatory):

- Detect package managers (in_progress)
- Delegate ln-821-npm-upgrader child runs (pending)
- Delegate ln-822-nuget-upgrader child runs (pending)
- Delegate ln-823-pip-upgrader child runs (pending)
- Aggregate dependency-worker summaries (pending)

Worker Invocation (MANDATORY)

PhaseWorkerContext
3ln-821-npm-upgraderIsolated child run with packageManager, runId, and exact summaryArtifactPath
3ln-822-nuget-upgraderIsolated child run with packageManager, runId, and exact summaryArtifactPath
3ln-823-pip-upgraderIsolated child run with packageManager, runId, and exact summaryArtifactPath

All workers: start the child runtime, checkpoint the child_run metadata, then invoke the worker skill explicitly and consume the emitted dependency-worker summary envelope via record-worker-result.

# One invocation per detected package manager (sequential per family):
node shared/scripts/dependency-runtime/cli.mjs start --skill {worker} --identifier {packageManager} --manifest-file {workerManifestPath} --run-id {childRunId} --summary-artifact-path {childSummaryArtifactPath}
node shared/scripts/optimization-runtime/cli.mjs checkpoint --phase PHASE_3_DELEGATE --payload '{"child_run":{"worker":"{worker}","run_id":"{childRunId}","summary_artifact_path":"{childSummaryArtifactPath}","package_manager":"{packageManager}"}}'
Skill(skill: "{worker}", args: "{packageManager} --run-id {childRunId} --summary-artifact-path {childSummaryArtifactPath}")
Read {childSummaryArtifactPath}
node shared/scripts/optimization-runtime/cli.mjs record-worker-result --payload-file {childSummaryArtifactPath}

Worker token substitution: {worker} is one of ln-821-npm-upgrader, ln-822-nuget-upgrader, ln-823-pip-upgrader.


Definition of Done

  • Runtime started with a validated manifest and stable identifier
  • Package managers detected from project indicators
  • Pre-flight security and release-age checks completed
  • One child run delegated per planned worker family
  • Every child run emitted a valid dependency-worker summary
  • Coordinator report aggregates per-worker upgrades, warnings, and verification results
  • Final dependency-coordinator summary recorded before completion

Phase 7: Meta-Analysis

MANDATORY READ: Load shared/references/meta_analysis_protocol.md

Skill type: optimization-coordinator. Run after all phases complete. Output to chat using the optimization-coordinator format.


Version: 1.1.0 Last Updated: 2026-01-10

适合场景

01

用户想查找某类 Agent Skill 时

02

需要根据任务场景推荐可安装能力包时

03

需要对比不同来源的安装命令和来源信息时

能力概览

能力 1

按任务关键词查找相关 Skills

能力 2

展示可复制的安装命令

能力 3

保留来源站点、仓库和原始说明,方便继续核验

能力 4

展示第三方安全扫描或审计结果

安装后应在对应宿主中按原始 README 的触发条件使用;具体调用方式请以来源页面和 README 为准。

平台分布

Codex

36.04%
按下载量换算372

Claude

29.56%
按下载量换算305

Cursor

18.27%
按下载量换算189

Gemini CLI

10.7%
按下载量换算110

安全审计

Gen Agent Trust Hub

通过

Socket

可疑

Snyk

可疑

权限和风险

需要联网

该 Skill 可能需要联网访问来源站点、仓库或外部 API;具体网络访问范围需要结合源码和 README 复核。

安装前确认

本站仅展示第三方公开信息,不托管安装包,不提供自动安装或运行环境。安装前应自行审查源码、依赖和命令行为。来源安全扫描存在 warning/failed 结果,不能写成本站确认安全。当前只有一个来源,正式发布前建议补源仓库或其他目录站核验。

来源信息

继续浏览同类 Skills