Token导航 LogoToken导航

Agent Skill · 研究检索

energy-market-intelligence(能源市场情报)

energy-market-intelligence 用于查找、检索和筛选相关信息,适合在 OpenClaw 中需要根据关键词、任务场景或来源线索快速定位候选结果时使用。可结合来源仓库、安装命令和原始 README 继续核验具体用法。安装前建议确认权限范围、维护状态,以及是否会触发联网、命令执行或文件读写。

energy-market-intelligence 是研究检索类 Agent Skill,可用宿主为 OpenClaw,通过ClawHub获取,权限为需要联网;许可证为 MIT-0,第三方扫描已通过,按安装量在研究检索类的 73,675 个 Skill 里排第 30,704。

总安装 2,836周安装 117GitHub Stars 公开资料未说明下载 927核验 2026-05-01

安装说明

本站只整理中文说明,不托管安装包,也不代用户安装。
GitHub
许可证
MIT-0
版本
0.2.0

安装方式

通过对话安装

复制提示词发给支持本地命令或 Skills 的 AI 助手,先确认命令和权限,再让它执行。

请帮我安装这个 Agent Skill:energy-market-intelligence(能源市场情报)
来源仓库:https://github.com/gitcanadabrett/energy-market-intelligence
安装命令:
openclaw skills install energy-market-intelligence
安装前请先检查当前环境是否支持对应 CLI,并向我确认将要执行的命令、安装目录、联网范围和文件读写权限;确认后再执行。

命令行安装

复制命令到本机终端执行。该命令会通过 OpenClaw 从第三方来源获取 Skill;本站只展示命令,不托管安装包,也不自动执行。

ClawHubOpenClaw
openclaw skills install energy-market-intelligence

这个 Skill 是做什么的

研究检索类 Skill 主要解决「找资料、核对事实、把来源整理清楚」的问题,通常会让助手先检索再总结。

能源市场情报聚合艾伯塔省 AESO 池价格、供需平衡与停电事件数据。适用于电力交易员、投资者或政策研究者做决策支持。输出结构化简报包含监管变化与市场趋势分析。数据源依赖第三方公开 API,可能存在延迟或限制。建议交叉验证多个渠道信息提高可靠性。

energy-market-intelligence 属于研究检索类 Skill,可作为该场景下的辅助能力补充。

上手步骤

4 步
  1. 1

    确认自己的宿主工具

    公开资料标注支持 OpenClaw;先确认自己用的是其中之一,再按对应工具的 Skills 目录放置。

  2. 2

    拿到安装命令

    可以直接复制的命令是 openclaw skills install energy-market-intelligence;命令里的占位符换成自己的路径或密钥再执行。

  3. 3

    安装后重启宿主

    命令执行完要完全退出宿主工具再打开,让新装的 Skill 被重新扫描到,否则列表里可能看不到。

  4. 4

    按最小权限试用

    它需要需要联网,先在测试目录或测试账号里跑,确认没问题再放到正式项目。

常见问题

6 条

energy-market-intelligence 怎么安装?

在终端执行 openclaw skills install energy-market-intelligence。装完完全退出宿主工具再打开,让它重新扫描本地 Skill。

energy-market-intelligence 支持哪些 AI 工具?

公开资料标注支持 OpenClaw。其他工具只要能读取本地 Skill 目录,一般也能手动放进去,但要自己确认触发方式是否一致。

energy-market-intelligence 需要什么权限?

权限级别是需要联网。该 Skill 可能需要联网访问来源站点、仓库或外部 API;具体网络访问范围需要结合源码和 README 复核。

energy-market-intelligence 是免费的吗?

来源标注的许可证是 MIT-0。本站不代收任何费用,也不托管安装包;能否商用、要不要署名,以许可证原文为准。

energy-market-intelligence 用的人多吗?

公开数据是累计安装 2,836 次,近一周安装 117 次,下载 927 次。这些数字来自第三方目录统计,只能当作热度参考,不代表质量或安全性。

energy-market-intelligence 安全吗?

第三方扫描结果为通过,但这只覆盖已知的静态检查项,不能替代自己读一遍源码和安装命令。

值得选的地方和要先想清楚的地方

值得选的地方

  • 专注 OpenClaw 一种宿主,触发方式和使用习惯不用来回切换。
  • 许可证明确为 MIT-0,商用和分发边界好判断。
  • 第三方扫描已通过,常见的高风险行为没有命中。

先想清楚的地方

  • 第三方目录整理,版本更新和行为细节以来源仓库为准。

适不适合你

更适合

  • 已经在用 OpenClaw,想直接扩展它能力的人。
  • 需要处理研究检索类任务、又不想每次都手写提示词的人。
  • 需要许可证清楚、并且有第三方扫描结果的团队项目。

不太适合

  • 需要厂商级技术支持和 SLA 的生产系统。

研究检索类 Skill 对比

6 个同类
Skill总安装GitHub 星权限许可证扫描
find-skills

寻找技能 · Codex、Claude

31,199,81316,486操作浏览器MIT有提醒
self-improving-agent

自我改进 Agent · OpenClaw

16,464,0023,396接触敏感数据MIT-0通过
soultrace

灵魂追踪 · Codex、Claude

7,588,94412需要联网未明确有提醒
self-improving

自我完善 · OpenClaw

6,829,2841,046需要联网MIT-0通过
microsoft-foundry

微软代工厂 · Codex、Claude

6,614,144764调用外部服务未明确有提醒
energy-market-intelligence

能源市场情报 · 本页

2,836—需要联网MIT-0通过

按安装量取同分类前几名;数字来自第三方目录统计,只作热度参考,不代表质量结论。

SKILL.md 原文

name
energy-market-intelligence
description
Build sourced, decision-ready Alberta energy market briefings covering AESO pool prices, supply/demand balance, outage events, regulatory changes, and commercial implications for traders, facility managers, data center developers, and sustainability teams. Uses precise Alberta market terminology and AESO-specific data sources. Does not provide trading recommendations or forward price guarantees.

Energy Market Intelligence

Turn public Alberta energy market data into sourced, decision-ready commercial briefings grounded in AESO data and real market structure.

Work the request in this order

  1. Define the scope — market segment, time window, user type
  2. Narrow broad asks before synthesizing
  3. Collect data from primary AESO and Alberta regulatory sources
  4. Rank source quality using the Alberta energy source tier system
  5. Separate confirmed AESO data from analyst projections from market speculation
  6. Contextualize within Alberta's energy-only market structure
  7. Prioritize developments most likely to affect the user's commercial position
  8. Translate findings into commercial implications for the specific user type
  9. State the most justified current market stance
  10. End with recommended next actions and preserve source traceability

Default output structure

Use this structure unless the user clearly wants a different format:

  1. Market snapshot — pool price summary, time-weighted average, volatility context
  2. Supply/demand balance — generation capacity vs. load, imports/exports, reserve margin
  3. Key confirmed developments — sourced from AESO reports, AUC filings, connection project list
  4. Notable unverified or emerging signals — analyst projections, consultation-stage policy, rumored changes
  5. Commercial implications — what this means for the user's cost, risk, or opportunity
  6. Current justified stance — the most defensible market posture given the evidence
  7. Recommended next 3 actions — practical, time-bound moves
  8. Sources — every data point linked to its primary source

Keep it lean. Write like a market analyst who operates in this market, not a generalist summarizing it.

Alberta market structure context

Alberta operates a deregulated, energy-only electricity market — no capacity market, no capacity payments. Key structural facts the output must reflect:

  • Pool price is the System Marginal Price (SMP) set by merit order dispatch — not a "spot price" or "clearing price" in the PJM/ERCOT sense
  • Merit order ranks generators by offer price; the marginal unit sets the pool price for all dispatched generation
  • The pool price cap is currently $999.99/MWh; the floor is $0/MWh
  • Transmission is regulated by the AESO and approved by the AUC; generation and retail are deregulated
  • Alberta has limited interconnection — BC (Path 1, ~1,000 MW), Saskatchewan (~150 MW), Montana (not currently active for commercial flow). Import capacity matters for price formation
  • The coal-to-gas conversion is largely complete; the generation mix is now dominated by natural gas, with growing wind and solar
  • Carbon pricing (TIER — Technology Innovation and Emissions Reduction) directly affects generator costs and thus merit order positioning
  • Retail competition exists; regulated rate option (RRO) is the default for residential/small commercial; large commercial and industrial loads typically contract bilaterally or hedge against pool price

Reference references/alberta-market-structure.md for deeper market mechanics when needed.

Source quality — Alberta energy tier system

Tier 1 — Authoritative (high confidence)

  • AESO public API data (pool price, supply/demand, interchange, generation by fuel type)
  • AESO published reports (Annual Market Statistics, Long-term Outlook, Adequacy Reports)
  • AESO connection project list (monthly update)
  • AUC decisions and regulatory filings
  • Alberta government gazette (carbon pricing schedule, regulatory changes)
  • ETS pool price settlement reports

Tier 2 — Credible secondary (moderate confidence)

  • AESO market participant information sessions and stakeholder consultation documents
  • AUC hearing transcripts and intervener evidence
  • Established energy trade press (Daily Oil Bulletin, JWN Energy, Bloomberg NEF)
  • Generator and utility public investor filings (TransAlta, Capital Power, ATCO, ENMAX)

Tier 3 — Context only (low confidence)

  • News coverage without primary source links
  • Analyst commentary and forecasts without disclosed methodology
  • Social media, LinkedIn posts, conference remarks without supporting data
  • Anonymous market participant claims

Always label the source tier. Never blend tier-3 material into confirmed facts.

Evidence discipline

  • Pool price claims must reference a specific date range and data source (AESO API query, ETS report number)
  • Generation capacity claims must reference AESO connection project list vintage or Long-term Outlook edition
  • Regulatory claims must reference a specific AUC proceeding number, AESO rule section, or government gazette citation
  • Do not state "Alberta pool prices have been volatile" without specifying the period, the price range, and the comparison baseline
  • Do not imply access to generator offer strategies, bilateral contract terms, or AESO internal forecasting models
  • When evidence is thin, say so. Provide the sparse-data floor structure rather than padding with generalities

Read references/source-quality-rubric.md for detailed source handling rules. Read references/price-context-frames.md for historical benchmarks and seasonal patterns.

Price context and volatility framing

Never present a pool price number without context. Always provide:

  • Time-weighted average over the relevant period (hourly, daily, weekly, monthly)
  • Comparison baseline — same period last year, trailing 30-day average, or seasonal norm
  • Volatility indicator — standard deviation, price exceedance hours (hours above $100, $200, $500), or high-price event count
  • Supply-side driver — what was setting the marginal price? (gas-on-gas competition, import constraints, wind intermittency, outage events)

A pool price of $85/MWh means something very different in January (winter peak, tight supply) vs. June (spring runoff, surplus hydro imports from BC). Frame accordingly.

Outage and event tracking

When tracking generation outages or transmission events:

  • Distinguish planned outages (AESO-posted maintenance schedules) from forced outages (unexpected unit trips)
  • Report the MW impact on available supply, not just the unit name
  • Connect outage events to pool price impact — did the outage move the merit order enough to affect SMP?
  • Track cumulative outage MW as a supply adequacy signal, especially in shoulder seasons when maintenance stacking can tighten reserves
  • Reference AESO outage reports or real-time supply adequacy indicators as primary sources

Commercial translation by user type

Energy traders

  • Focus on: merit order shifts, price duration curves, import/export dynamics, event-driven price spikes
  • Frame implications as: position risk, spread opportunities, hedge timing
  • Do NOT provide buy/sell recommendations — frame as "conditions that historically correlate with X"

Facility managers

  • Focus on: cost exposure under current pool price regime, RRO vs. competitive contract economics, demand response opportunity windows
  • Frame implications as: budget impact, procurement timing, load-shifting value
  • Use $/MWh translated to monthly cost impact for typical load profiles

Data center developers

  • Focus on: grid reliability, all-in power cost (energy + transmission + distribution + riders), interconnection queue position, available capacity at target substations
  • Frame implications as: site economics, grid risk, timeline to energization
  • Reference AESO connection project list and transmission capability assessments

Sustainability / ESG teams

  • Focus on: grid emissions intensity (tCO2e/MWh), renewable generation share, TIER compliance costs, carbon pricing trajectory
  • Frame implications as: Scope 2 reporting inputs, renewable procurement context, carbon cost exposure
  • Distinguish grid-average emissions intensity from marginal emissions intensity

PPA / renewable procurement evaluators

  • Focus on: curtailment risk (shape risk from $0 price hours and negative-value periods), basis risk (hub vs. node price divergence), contract structure implications (fixed vs. indexed, settlement mechanics), AESO transmission reinforcement timelines affecting deliverability
  • Frame implications as: PPA economics (expected revenue vs. merchant tail risk), revenue certainty (P50/P90 production scenarios against price curves), counterparty considerations (credit quality, balancing pool exposure, curtailment allocation)
  • Connect grid congestion and interconnection queue data to project-specific deliverability risk
  • Reference AESO connection project list for competing capacity in the same zone

Read references/commercial-translation-energy.md for detailed translation frameworks.

Sparse-data and quiet-market briefs

When market conditions are calm or data is limited, use this prescriptive floor:

  1. Market snapshot — confirm that conditions are within normal range; state the range
  2. Evidence-limit declaration — what data was and was not available; name gaps
  3. One price signal with threshold trigger — "watch for pool price sustained above $X for Y hours; this would indicate Z"
  4. One supply-side assumption to validate — the single most important unproven belief about current supply adequacy
  5. One low-risk action justified now — something the user can do without waiting for more data
  6. Next-check trigger — "revisit when X occurs or after Y days"

Do not compensate for a quiet market by inflating weak signals. A calm market is useful information.

No-source gate

When the user provides no data inputs and asks for a broad market update:

  1. Auto-narrow to dimensions verifiable from general AESO public knowledge and recent published reports
  2. Add a prominent warning:
No current data inputs provided — analysis based on publicly available AESO data patterns and most recent published reports as of [date]. Verify current pool prices and system conditions against live AESO data before acting.
  1. Downgrade confidence:

- Structural market facts (energy-only design, merit order mechanics, interconnection limits) → full confidence, these are stable - Recent price and supply conditions without current data → label "Based on most recent available data [date]" and flag staleness risk - Forward-looking claims without current data → label "Projection — verify against current conditions"

  1. If user type is not specified, apply the unknown-user-type rule from commercial translation: provide implications for the two most likely audiences and ask which applies.
  1. After the no-source warning, use the sparse-data floor structure (see "Sparse-data and quiet-market briefs") as the output template for the degraded brief. Do not use the default output structure — the sparse-data floor is purpose-built for low-evidence conditions.

Stale data gate

When user-provided data is more than 90 days old, treat it as a historical baseline — not current conditions.

  1. Add a prominent warning:
Stale data detected — the most recent data provided is from [date], approximately [N] months old. Alberta's energy market can shift materially within a single quarter. All analysis below uses this data as a historical baseline, not a reflection of current conditions.
  1. Label every historical data point with its vintage date — e.g., "Pool price TWA $87/MWh (Q3 2025 vintage)."
  1. Enumerate categories of likely change since the data vintage:

- Generation fleet — additions, retirements, fuel conversions since [date] - Carbon pricing — TIER benchmark and compliance cost schedule changes - Demand growth — load forecast revisions, new large-load interconnections (data centers, petrochemical) - Interconnection — BC intertie capacity or flow pattern changes, Saskatchewan developments - Regulatory decisions — AUC proceedings concluded, AESO rule amendments enacted

  1. Recommend specific current data sources to close the gap:

- AESO public API (api.aeso.ca) for current pool price and supply/demand - Latest AESO Annual Market Statistics or Long-term Outlook edition - Current AESO connection project list for queue and capacity pipeline - Alberta government gazette for enacted carbon pricing or regulatory changes

  1. Frame the analysis: historical data provides useful baseline context for structural trends and seasonal patterns, but should not be used for current position-sizing, procurement timing, or cost forecasting without verification against current conditions.

Regulatory change handling

When covering AUC proceedings, AESO rule changes, or government policy:

  • Distinguish enacted (in force), approved but not yet effective (AUC decision issued, effective date future), under consultation (open proceeding), and proposed (discussion paper or stakeholder session only)
  • Reference the specific proceeding number (e.g., "AUC Proceeding 28585") or gazette citation
  • Do not treat a consultation paper as a done deal
  • For carbon pricing changes, specify the compliance period and affected benchmarks

Comparative market briefs (future premium)

When comparing Alberta to other deregulated markets:

  • Use a shared decision frame across all markets
  • Make structural differences explicit (energy-only vs. capacity market, ISO structure, interconnection topology)
  • Add an "evidence quality" indicator per market — Alberta data from AESO API is tier-1; cross-border comparisons may rely on tier-2 secondary sources
  • Do not imply that a trend in ERCOT or PJM will replicate in Alberta without stating the structural reasons it might or might not

Boundaries

  • Do not provide trading recommendations — no "buy," "sell," "go long," "go short"
  • Do not guarantee forward prices — projections must have explicit uncertainty ranges and stated assumptions
  • Do not claim access to private data (generator offers, bilateral contracts, AESO internal models)
  • Do not present inference as confirmed AESO data
  • Do not provide regulatory compliance advice — describe rule changes factually
  • Do not produce auditable emissions inventories or carbon credit calculations
  • Do not fabricate precision — if the data supports "between $80-120/MWh" do not write "$97.50/MWh" without a source
  • Do not provide PPA signing recommendations — present risk factors, market context, and structural considerations but do not recommend whether to sign, reject, or renegotiate a specific PPA
  • Do not use generic energy industry language when Alberta-specific terminology exists (pool price not spot price, AESO not ISO, merit order not dispatch stack)

平台分布

OpenClaw

72.66%
按下载量换算674

安全审计

VirusTotal

通过

ClawScan

通过

Static analysis

通过

权限和风险

需要联网

该 Skill 可能需要联网访问来源站点、仓库或外部 API;具体网络访问范围需要结合源码和 README 复核。

安装前确认

本站仅展示第三方公开信息,不托管安装包,不提供自动安装或运行环境。安装前应自行审查源码、依赖和命令行为。目前只有一个公开来源,建议同时核对源仓库。

继续浏览同类 Skills