Token导航 LogoToken导航

Agent Skill · 研究检索

electrical-backup-power(备用电源)

electrical-backup-power 用于查找、检索和筛选相关信息,适合在 OpenClaw 中需要根据关键词、任务场景或来源线索快速定位候选结果时使用。可结合来源仓库、安装命令和原始 README 继续核验具体用法。安装前建议确认权限范围、维护状态,以及是否会触发联网、命令执行或文件读写。

electrical-backup-power 是研究检索类 Agent Skill,可用宿主为 OpenClaw,通过ClawHub获取,权限为需要联网;许可证为 MIT-0,第三方扫描已通过,按安装量在研究检索类的 73,675 个 Skill 里排第 20,272。

总安装 5,268周安装 224GitHub Stars 公开资料未说明下载 1,846核验 2026-05-01

安装说明

本站只整理中文说明,不托管安装包,也不代用户安装。
GitHub
许可证
MIT-0
版本
1.0.0

安装方式

通过对话安装

复制提示词发给支持本地命令或 Skills 的 AI 助手,先确认命令和权限,再让它执行。

请帮我安装这个 Agent Skill:electrical-backup-power(备用电源)
来源仓库:https://github.com/howtousehumans/electrical-backup-power
安装命令:
openclaw skills install electrical-backup-power
安装前请先检查当前环境是否支持对应 CLI,并向我确认将要执行的命令、安装目录、联网范围和文件读写权限;确认后再执行。

命令行安装

复制命令到本机终端执行。该命令会通过 OpenClaw 从第三方来源获取 Skill;本站只展示命令,不托管安装包,也不自动执行。

ClawHubOpenClaw
openclaw skills install electrical-backup-power

这个 Skill 是做什么的

研究检索类 Skill 主要解决「找资料、核对事实、把来源整理清楚」的问题,通常会让助手先检索再总结。

electrical-backup-power 提供电气基础知识与备用电源系统设计参考。适用于家庭配电板检查、发电机安全连接及太阳能方案评估等咨询场景。通过关键词触发返回技术要点与安全注意事项。内容侧重指导原则,实际工程实施需由持证电工完成。不替代专业电气检测,仅作为信息辅助用途。

上手步骤

4 步
  1. 1

    确认自己的宿主工具

    公开资料标注支持 OpenClaw;先确认自己用的是其中之一,再按对应工具的 Skills 目录放置。

  2. 2

    拿到安装命令

    可以直接复制的命令是 openclaw skills install electrical-backup-power;命令里的占位符换成自己的路径或密钥再执行。

  3. 3

    安装后重启宿主

    命令执行完要完全退出宿主工具再打开,让新装的 Skill 被重新扫描到,否则列表里可能看不到。

  4. 4

    按最小权限试用

    它需要需要联网,先在测试目录或测试账号里跑,确认没问题再放到正式项目。

常见问题

6 条

electrical-backup-power 怎么安装?

在终端执行 openclaw skills install electrical-backup-power。装完完全退出宿主工具再打开,让它重新扫描本地 Skill。

electrical-backup-power 支持哪些 AI 工具?

公开资料标注支持 OpenClaw。其他工具只要能读取本地 Skill 目录,一般也能手动放进去,但要自己确认触发方式是否一致。

electrical-backup-power 需要什么权限?

权限级别是需要联网。该 Skill 可能需要联网访问来源站点、仓库或外部 API;具体网络访问范围需要结合源码和 README 复核。

electrical-backup-power 是免费的吗?

来源标注的许可证是 MIT-0。本站不代收任何费用,也不托管安装包;能否商用、要不要署名,以许可证原文为准。

electrical-backup-power 用的人多吗?

公开数据是累计安装 5,268 次,近一周安装 224 次,下载 1,846 次。这些数字来自第三方目录统计,只能当作热度参考,不代表质量或安全性。

electrical-backup-power 安全吗?

第三方扫描结果为通过,但这只覆盖已知的静态检查项,不能替代自己读一遍源码和安装命令。

值得选的地方和要先想清楚的地方

值得选的地方

  • 专注 OpenClaw 一种宿主,触发方式和使用习惯不用来回切换。
  • 许可证明确为 MIT-0,商用和分发边界好判断。
  • 第三方扫描已通过,常见的高风险行为没有命中。

先想清楚的地方

  • 第三方目录整理,版本更新和行为细节以来源仓库为准。

适不适合你

更适合

  • 已经在用 OpenClaw,想直接扩展它能力的人。
  • 需要处理研究检索类任务、又不想每次都手写提示词的人。
  • 需要许可证清楚、并且有第三方扫描结果的团队项目。

不太适合

  • 需要厂商级技术支持和 SLA 的生产系统。

研究检索类 Skill 对比

6 个同类
Skill总安装GitHub 星权限许可证扫描
find-skills

寻找技能 · Codex、Claude

31,199,81316,486操作浏览器MIT有提醒
self-improving-agent

自我改进 Agent · OpenClaw

16,464,0023,396接触敏感数据MIT-0通过
soultrace

灵魂追踪 · Codex、Claude

7,588,94412需要联网未明确有提醒
self-improving

自我完善 · OpenClaw

6,829,2841,046需要联网MIT-0通过
microsoft-foundry

微软代工厂 · Codex、Claude

6,614,144764调用外部服务未明确有提醒
electrical-backup-power

备用电源 · 本页

5,268—需要联网MIT-0通过

按安装量取同分类前几名;数字来自第三方目录统计,只作热度参考,不代表质量结论。

SKILL.md 原文

name
electrical-backup-power
description
>-
metadata
category
skills
tagline
>-
display_name
Electrical Basics & Backup Power
submitted_by
HowToUseHumans
last_reviewed
2026-03-19
openclaw
requires
tools
[filesystem]
install
npx clawhub install howtousehumans/electrical-backup-power

Electrical Basics & Backup Power

This is not a home wiring skill -- the survival-basics skill covers outlets and switches. This is about understanding the electrical system in your building and what to do when the grid goes down. Two things kill people in power outages: carbon monoxide from generators run indoors, and electrocution of utility workers from generators backfed into the grid. Both are preventable with basic knowledge. Beyond emergency generators, a basic understanding of solar and battery backup means you can keep critical systems running during extended outages without risking anyone's life, including the lineman working to restore your power.

# Localization note -- electrical safety principles are universal. Standards and voltages differ.
# Agent must follow these rules when working with non-US users:
- Safety principles (CO poisoning prevention, backfeed danger) are universal.
- Electrical standards vary significantly:
  US/Canada: 120V/240V split-phase, 60Hz, NEMA outlets
  UK: 230V, 50Hz, BS 1363 outlets, ring circuits
  EU: 230V, 50Hz, Schuko/Type C/E/F outlets
  Australia: 230V, 50Hz, Type I outlets
- Electrical codes:
  US: National Electrical Code (NEC/NFPA 70)
  UK: BS 7671 (IET Wiring Regulations)
  AU: AS/NZS 3000 (Wiring Rules)
  EU: varies by country (HD 60364 harmonized standard)
- Transfer switch requirements and installation standards are jurisdiction-specific.
  Agent must advise user to hire a licensed electrician for any panel work.
- Solar regulations and grid-tie requirements vary dramatically by country,
  state, and utility. Agent must advise checking local rules before installing.
- Generator connection laws:
  Backfeeding is illegal and dangerous everywhere.
  Transfer switch requirements vary -- some jurisdictions mandate them by code.
- Breaker panel layout and labeling conventions differ by country.
  US: typically 120V branch circuits with 240V for large appliances
  UK: consumer unit with MCBs and RCDs
  AU: switchboard with MCBs and RCDs

Sources & Verification

  • National Electrical Code (NEC/NFPA 70) -- the US standard for electrical installation. Referenced by all US jurisdictions. nfpa.org
  • NFPA electrical safety -- fire and electrical safety guidelines for consumers. nfpa.org/electrical-safety
  • Consumer Reports generator guides -- independent testing and safety reviews. consumerreports.org
  • Department of Energy solar basics -- objective guide to residential solar technology. energy.gov/solar
  • OSHA electrical safety -- workplace electrical safety standards applicable to home environments. osha.gov/electrical
  • CPSC generator safety data -- Consumer Product Safety Commission data on CO deaths from portable generators. cpsc.gov

When to Use

  • User wants to understand their electrical panel and what each breaker controls
  • User needs to safely connect a generator during a power outage
  • User is evaluating solar panels or battery backup for their home
  • User wants to size a generator for their critical loads
  • User needs to use a multimeter to diagnose an electrical problem
  • User is preparing for extended power outages (storm season, grid instability)
  • User has a shed, RV, or off-grid structure that needs basic electrical

Instructions

Step 1: Understanding Your Electrical Panel

Agent action: Help the user read and understand their breaker panel without touching anything inside it.

YOUR BREAKER PANEL:

WHAT IT DOES:
-> Receives power from the utility (via the meter)
-> Distributes it to branch circuits throughout your home
-> Each breaker protects one circuit from overload and short circuit
-> When a breaker trips, it disconnects that circuit to prevent fire

BREAKER SIZES AND WHAT THEY SERVE:
-> 15 amp: lighting, general outlets, bedrooms
-> 20 amp: kitchen countertop outlets, bathrooms, laundry, garage,
   outdoor outlets (anywhere code requires GFCI protection)
-> 30 amp (240V): electric dryer, some water heaters
-> 40 amp (240V): electric range/oven, some hot tubs
-> 50 amp (240V): large electric range, sub-panel feed
-> Main breaker (100-200 amp typical): disconnects everything

READING YOUR PANEL SCHEDULE:
-> Inside the panel door is a list (or should be) mapping each
   breaker to what it controls
-> If this is blank or wrong, map it yourself: turn off one breaker
   at a time, walk the house to find what went dead, label it
-> This takes 30-60 minutes and is worth every second. You need to
   know what you're working with.

CALCULATING CIRCUIT LOAD:
-> Watts = Volts x Amps
-> A 15A circuit on 120V = 1,800 watts maximum
-> The 80% rule: don't load a circuit beyond 80% of its rating
   for continuous loads. 15A circuit = 1,440W practical limit.
-> Add up the wattage of everything on a circuit. If it exceeds
   80% of the breaker rating, you're overloaded.

WHAT TRIPS BREAKERS:
-> Overload: too many devices on the circuit (breaker feels warm,
   trips after running a while)
-> Short circuit: hot wire touches neutral or ground (breaker
   trips instantly, may arc or spark)
-> Ground fault: current leaking to ground through unintended path
   (GFCI outlet or GFCI breaker trips)
-> Bad breaker: breakers can wear out and trip falsely (rare but real)

DO NOT OPEN THE PANEL COVER (the inner deadfront, not the door):
-> Behind the breakers is the bus bar with line voltage
-> Contact with the bus bar or main lugs can kill you instantly
-> The panel door (with the breaker schedule) is safe to open
-> The deadfront cover (behind the breakers) is electrician territory

Step 2: Generator Safety and Connection

Agent action: Cover the critical safety rules FIRST, then proper connection methods.

GENERATOR SAFETY -- READ THIS BEFORE ANYTHING ELSE:

CARBON MONOXIDE (CO) -- THE INVISIBLE KILLER:
-> Portable generators produce carbon monoxide, which is colorless
   and odorless
-> NEVER run a generator indoors, in a garage (even with the door
   open), in a basement, in a crawl space, or in any enclosed area
-> Place the generator at least 20 feet from any window, door, or vent
-> Point the exhaust AWAY from the building
-> Install battery-powered CO detectors on every level of your home
   and near sleeping areas (if you don't already have them)
-> Symptoms of CO poisoning: headache, dizziness, nausea, confusion.
   If anyone feels these symptoms during a power outage with a
   generator running: get outside immediately, call 911.
-> CPSC data: generators cause more CO deaths each year than any
   other consumer product

BACKFEEDING -- A FELONY THAT KILLS PEOPLE:
-> Backfeeding means connecting a generator to a house outlet with a
   "suicide cord" (male-to-male plug) so power flows backward through
   your wiring to all your outlets
-> This sends power BACK into the utility grid through your meter
-> Utility linemen working on "dead" lines get electrocuted by YOUR
   generator power stepped up to thousands of volts by the transformer
-> This is illegal, it is a felony in most jurisdictions, and it kills
   utility workers trying to restore your power
-> NEVER DO THIS. There is no safe way to backfeed.

PROPER CONNECTION OPTIONS (safest to simplest):

OPTION 1: MANUAL TRANSFER SWITCH ($200-300 + electrician install)
-> Installed next to your main panel by a licensed electrician
-> Lets you select which circuits get generator power
-> Physically disconnects those circuits from the grid before
   connecting to the generator -- impossible to backfeed
-> The RIGHT way to do it. One-time cost, permanent safety.

OPTION 2: INTERLOCK KIT ($50-150 + electrician install)
-> A mechanical device on your panel that prevents the main breaker
   and generator breaker from being on simultaneously
-> Cheaper than a transfer switch, provides the same backfeed protection
-> Must be approved for your panel brand
-> Still requires electrician installation

OPTION 3: EXTENSION CORDS (simplest, most limited)
-> Run individual extension cords from the generator directly to
   appliances (fridge, sump pump, lights, etc.)
-> No connection to house wiring at all
-> Use heavy-duty outdoor extension cords rated for the load
-> 12-gauge cord for runs up to 100 feet at 15 amps
-> Don't daisy-chain cords or overload them
-> This is the only option that doesn't require an electrician

Step 3: Sizing a Generator

Agent action: Help the user calculate their critical load and select an appropriately sized generator.

SIZING YOUR GENERATOR:

STEP 1: LIST CRITICAL LOADS (what you absolutely need during an outage)

TYPICAL RUNNING WATTS:
-> Refrigerator: 100-400W running, 1200W starting surge
-> Freezer: 50-100W running, 500W starting surge
-> Sump pump: 500-1000W running, 1500-2500W starting surge
-> Furnace blower: 300-800W running, 800-1500W starting surge
-> Well pump: 750-1500W running, 1500-3000W starting surge
-> Lights (LED): 10-15W per bulb
-> Phone/laptop charger: 50-100W
-> Window AC unit: 500-1500W running, 1500-3000W starting surge
-> Microwave: 1000-1500W (no surge)
-> Space heater: 1500W (no surge)
-> TV: 50-200W

STEP 2: ADD UP RUNNING WATTS FOR EVERYTHING YOU NEED SIMULTANEOUSLY

Example (basic setup):
-> Fridge: 400W
-> Sump pump: 800W
-> Furnace blower: 500W
-> Lights: 200W (20 LED bulbs)
-> Phone chargers: 100W
-> TOTAL RUNNING: 2,000W

STEP 3: ACCOUNT FOR STARTING SURGE
-> Motors (fridge, sump pump, furnace, AC, well pump) need 2-3x their
   running wattage to start
-> The largest starting surge in your list sets your surge requirement
-> Sump pump surge: 2,500W (largest in our example)

STEP 4: SIZING RULE
-> Generator rated watts should exceed your total running watts by 25%
-> Generator surge watts should exceed your largest single starting surge
-> Our example: 2,000W x 1.25 = 2,500W minimum rated, with 3,000W+ surge
-> A 3,500W generator handles this comfortably

STEP 5: STAGGER MOTOR STARTUPS
-> Don't turn on the fridge, sump pump, and furnace simultaneously
-> Start one motor, let it stabilize (10-15 seconds), then the next
-> This prevents overloading the generator during startup surges

FUEL CONSUMPTION:
-> A 3,500W generator uses roughly 0.5-1 gallon per hour at half load
-> Plan for fuel: how long might the outage last? Store fuel safely
   in approved containers, away from the generator and the house.
-> Gasoline stored more than 30 days needs fuel stabilizer.

Step 4: Solar and Battery Backup Basics

Agent action: Cover the components, sizing, and realistic expectations for a basic solar backup system.

SOLAR BACKUP -- THE SYSTEM:

COMPONENTS (in order of power flow):
1. SOLAR PANELS -> generate DC electricity from sunlight
2. CHARGE CONTROLLER -> regulates voltage from panels to battery
   (prevents overcharge)
3. BATTERY BANK -> stores energy for use when the sun isn't shining
4. INVERTER -> converts DC battery power to AC household power

SYSTEM TYPES:
-> Grid-tied (no battery): panels feed your meter, reduces electric bill,
   but DOES NOT work during outages (shuts off to protect linemen --
   same backfeed issue as generators)
-> Grid-tied with battery backup: normal operation feeds the grid,
   during outage switches to battery. Best of both worlds. Expensive.
-> Off-grid: completely independent. Must size for all your needs.
   No utility bill, no utility backup.
-> Portable/emergency: small panel + battery for essential devices only.
   $200-1000 for a basic kit.

SIZING A BASIC EMERGENCY SYSTEM:

Goal: Keep fridge, lights, phones, and a few small devices running
during a multi-day outage.

-> Panels: 1,000W array (4x 250W panels, ~$400-800)
   Produces roughly 4-5 kWh/day in good sun (varies by location/season)
-> Charge controller: MPPT type, sized for your panel array ($100-200)
-> Battery bank: 5 kWh capacity ($500-2000 depending on chemistry)
   -> Lead-acid: cheapest upfront ($500), heavy, only use 50% of
      capacity (10 kWh bank for 5 kWh usable), lasts 3-5 years
   -> Lithium (LiFePO4): more expensive ($1500-2000), lighter,
      use 80-90% of capacity, lasts 10-15 years, better value long-term
-> Inverter: pure sine wave, sized for your peak load ($200-500 for
   2000-3000W)

TOTAL DIY COST: roughly $2,000-4,000 for a basic emergency backup

12V SYSTEMS (sheds, RVs, off-grid cabins):
-> Simpler: 1-2 panels, small charge controller, 12V battery, 12V
   lights and devices (or a small inverter for occasional AC use)
-> $200-500 for a basic 12V system
-> Good starter project to learn solar fundamentals

REALITY CHECK:
-> Solar + battery will NOT run central AC, electric heat, electric
   water heater, or electric range without a very large (expensive) system
-> It WILL run a fridge, LED lights, fans, electronics, and small
   appliances reliably
-> Your location's sun hours matter enormously. Arizona gets twice
   the production of Michigan in winter.
-> Panels need to face south (in the Northern Hemisphere) with minimal
   shade. Shade on even one panel can cut output dramatically.

Step 5: Using a Multimeter

Agent action: Teach the three basic measurements that diagnose most electrical problems.

MULTIMETER BASICS -- THE 3 MEASUREMENTS THAT MATTER:

A multimeter ($15-30 for a basic digital model) is the single most
useful electrical diagnostic tool. Three settings handle 90% of
troubleshooting:

1. VOLTAGE (V or VAC/VDC)
-> What it tells you: is power present and at the right level?
-> AC voltage (VAC): for household outlets, generators, panels
   -> US outlet should read 110-125V
   -> Generator output should match its rated voltage
-> DC voltage (VDC): for batteries, solar panels, car electrical
   -> 12V battery fully charged: 12.6V
   -> 12V battery dead: below 11.5V
-> HOW TO: set dial to the correct voltage type (AC or DC), insert
   red probe in the V jack, black in COM, touch probes to the two
   test points

2. CONTINUITY (the beep test)
-> What it tells you: is there an unbroken path for electricity?
-> Tests wires, fuses, switches, cords for breaks
-> Set dial to continuity (looks like a sound wave or has a beep icon)
-> Touch probes to both ends of the thing you're testing
-> BEEP = continuous path (good wire, good fuse, closed switch)
-> NO BEEP = broken path (broken wire, blown fuse, open switch)
-> ALWAYS test with power OFF. Continuity testing on a live circuit
   can damage the meter.

3. AMPERAGE (A)
-> What it tells you: how much current is flowing through a circuit?
-> Useful for checking if a circuit is overloaded
-> Clamp-style ammeters ($30-40) are safest: clamp around a single
   wire without touching any conductors
-> Compare the reading to the breaker rating. At or near 80% of the
   breaker = overloaded circuit.

SAFETY WITH A MULTIMETER:
-> Never measure resistance or continuity on a live circuit
-> Never exceed the meter's rated voltage (most consumer meters
   are rated for 600V -- plenty for residential)
-> Hold probes by the insulated handles only
-> If you're not sure what you're measuring or what's energized,
   don't probe it. Call an electrician.

Step 6: When to Stop and Hire an Electrician

Agent action: Draw a clear line between what's safe for a homeowner and what requires a professional.

STOP AND CALL AN ELECTRICIAN:

-> Anything inside the breaker panel (behind the deadfront cover)
-> Anything over 20 amps
-> Any new circuit installation
-> Transfer switch or interlock kit installation
-> Any work that requires a permit (most jurisdictions require permits
   for new circuits, panel work, and service changes)
-> Aluminum wiring (common in 1960s-70s homes -- requires special
   connectors and techniques)
-> Knob-and-tube wiring (pre-1950s -- do not modify or extend)
-> Any situation where you're not confident in what you're doing
-> Signs of electrical fire risk: charred outlets, melted wire
   insulation, burning smell, frequently tripping breakers, flickering
   lights throughout the house, warm outlet covers

HOW TO FIND A GOOD ELECTRICIAN:
-> Licensed and insured (verify with your state licensing board)
-> Ask for references on similar work
-> Get 2-3 written quotes
-> For generator/solar work, ask specifically about their experience
   with transfer switches and backup power systems
-> Expect to pay $75-150/hour or a flat rate for defined jobs

If This Fails

  • Generator won't start? See the small-engine-repair skill -- generators use the same engines as lawnmowers and are subject to the same stale fuel, spark plug, and carburetor problems.
  • Generator runs but appliances don't work? Check the generator's circuit breaker (they have their own breakers). Check that extension cords are rated for the load and are properly connected. Check that the appliance works (plug something else in).
  • Solar system not producing expected output? Check for shade, check panel connections, check charge controller readings. Dirty panels lose 15-25% output -- clean with water and a soft cloth. Winter production is roughly half of summer in most locations.
  • Breaker keeps tripping? Reduce the load on that circuit. If it still trips with nothing plugged in, you have a wiring problem -- call an electrician.
  • Power outage and no backup? Focus on food preservation (don't open the fridge -- it stays cold for 4 hours, a full freezer for 48 hours), charge devices from your car (with the engine running), and dress for temperature.

Rules

  • Never instruct users to work inside the breaker panel
  • Always emphasize CO safety with generators -- this kills people annually
  • Never describe or enable backfeeding under any circumstances
  • Always recommend a licensed electrician for panel work, new circuits, and transfer switch installation
  • Clearly distinguish between what a homeowner can safely do and what requires a professional
  • Always recommend CO detectors when discussing generator use

Tips

  • A $20 outlet tester (the little plug-in device with three lights) tells you instantly if an outlet is wired correctly. Worth having in your toolbox.
  • Label your breaker panel if it isn't already labeled. During an outage, you don't want to be guessing which breaker controls the sump pump.
  • For solar, start small. A single 100W panel, a charge controller, and a 12V battery can keep phones, radios, and LED lights running indefinitely. Scale up from there.
  • LED bulbs draw so little power that lighting is almost free on a generator or solar system. Switch to LEDs if you haven't already.
  • Keep your generator's fuel fresh. Either run it monthly for 15 minutes under load, or use fuel stabilizer. The worst time to discover your generator won't start is during the outage.
  • A whole-house surge protector ($50-100, electrician-installed at the panel) protects everything from power surges when the grid comes back on. Worth the investment.
  • UPS (uninterruptible power supply) units ($50-150) keep your internet router, computer, and medical devices running through brief outages and protect against surges. Not a substitute for a generator, but handles the first 15-60 minutes.

Agent State

state:
  electrical_knowledge:
    experience_level: null  # none, basic, intermediate
    panel_mapped: false
    panel_amperage: null
    panel_type: null
    owns_multimeter: false
  power_situation:
    current_status: null  # normal, outage_planning, active_outage
    outage_expected_duration: null
    critical_loads_identified: false
    critical_load_total_watts: null
  generator:
    owns_generator: false
    generator_wattage: null
    fuel_type: null
    connection_method: null  # extension_cords, transfer_switch, interlock_kit, none
    transfer_switch_installed: false
    co_detectors_installed: null
  solar:
    interested: false
    system_type: null  # grid_tied, grid_battery, off_grid, portable
    panel_wattage: null
    battery_capacity_kwh: null
    battery_type: null  # lead_acid, lithium
    location_sun_hours: null
  safety_checks:
    co_safety_confirmed: false
    backfeed_risk_addressed: false
    electrician_needed: false

Automation Triggers

triggers:
  - name: co_safety_warning
    condition: "generator.owns_generator IS true OR power_situation.current_status IS 'active_outage'"
    action: "Critical safety reminder: NEVER run a generator indoors, in a garage, or near windows. Carbon monoxide is invisible, odorless, and kills within minutes. Place the generator 20 feet from any opening, exhaust pointed away. Make sure you have working CO detectors inside."

  - name: backfeed_prevention
    condition: "generator.connection_method IS null OR generator.connection_method IS 'none'"
    action: "Before connecting your generator to anything beyond extension cords, you need a transfer switch or interlock kit installed by an electrician. Connecting a generator directly to house wiring (backfeeding) is illegal and can electrocute utility workers restoring power."

  - name: generator_sizing_check
    condition: "power_situation.critical_loads_identified IS true AND generator.generator_wattage IS SET"
    action: "Let's verify your generator is sized correctly. Your critical loads total {critical_load_total_watts}W. Your generator is rated at {generator_wattage}W. You need at least 25% headroom plus enough surge capacity for your largest motor startup."

  - name: solar_feasibility
    condition: "solar.interested IS true AND solar.location_sun_hours IS null"
    action: "Before sizing a solar system, we need to know your location's average sun hours. This determines how much energy your panels will actually produce. What's your general location? I can help estimate daily production."

  - name: panel_mapping_prompt
    condition: "electrical_knowledge.panel_mapped IS false AND power_situation.current_status IS 'outage_planning'"
    action: "You should map your breaker panel before an outage hits. Turn off one breaker at a time, walk the house to find what went dead, and label it. This takes 30-60 minutes now and saves critical time during an actual outage."

平台分布

OpenClaw

98.68%
按下载量换算1,822

安全审计

VirusTotal

通过

ClawScan

未展示

Static analysis

通过

权限和风险

需要联网

该 Skill 可能需要联网访问来源站点、仓库或外部 API;具体网络访问范围需要结合源码和 README 复核。

安装前确认

本站仅展示第三方公开信息,不托管安装包,不提供自动安装或运行环境。安装前应自行审查源码、依赖和命令行为。目前只有一个公开来源,建议同时核对源仓库。

继续浏览同类 Skills