afrexai-stakeholder-management(afrexai 利益相关者管理)

afrexai-stakeholder-management 用于查找、检索和筛选相关信息,适合在 OpenClaw 中需要根据关键词、任务场景或来源线索快速定位候选结果时使用。可结合来源仓库、安装命令和原始 README 继续核验具体用法。安装前建议确认权限范围、维护状态,以及是否会触发联网、命令执行或文件读写。

afrexai-stakeholder-management 是研究检索类 Agent Skill,可用宿主为 OpenClaw,通过ClawHub获取,权限为需要联网;许可证为 MIT-0,第三方扫描已通过,按安装量在研究检索类的 73,675 个 Skill 里排第 6,658。

总安装 21,404周安装 883GitHub Stars 公开资料未说明下载 6,993核验 2026-05-01

安装说明

本站只整理中文说明,不托管安装包,也不代用户安装。
GitHub
许可证
MIT-0
版本
1.0.0

安装方式

通过对话安装

复制提示词发给支持本地命令或 Skills 的 AI 助手,先确认命令和权限,再让它执行。

请帮我安装这个 Agent Skill:afrexai-stakeholder-management(afrexai 利益相关者管理)
来源仓库:https://github.com/1kalin/afrexai-stakeholder-management
安装命令:
openclaw skills install afrexai-stakeholder-management
安装前请先检查当前环境是否支持对应 CLI,并向我确认将要执行的命令、安装目录、联网范围和文件读写权限;确认后再执行。

命令行安装

复制命令到本机终端执行。该命令会通过 OpenClaw 从第三方来源获取 Skill;本站只展示命令,不托管安装包,也不自动执行。

ClawHubOpenClaw
openclaw skills install afrexai-stakeholder-management

这个 Skill 是做什么的

研究检索类 Skill 主要解决「找资料、核对事实、把来源整理清楚」的问题,通常会让助手先检索再总结。

协助识别利益相关方诉求并协调多方协作关系。用于复杂项目推进中减少阻力、增强共识与推动决策落地。提供影响力地图绘制与沟通策略定制工具。安装命令:openclaw skills install afrexai-stakeholder-management;应尊重各参与方的隐私边界。

适用宿主包括 OpenClaw,接入前应确认版本、权限和运行环境要求。

上手步骤

4 步
  1. 1

    确认自己的宿主工具

    公开资料标注支持 OpenClaw;先确认自己用的是其中之一,再按对应工具的 Skills 目录放置。

  2. 2

    拿到安装命令

    可以直接复制的命令是 openclaw skills install afrexai-stakeholder-management;命令里的占位符换成自己的路径或密钥再执行。

  3. 3

    安装后重启宿主

    命令执行完要完全退出宿主工具再打开,让新装的 Skill 被重新扫描到,否则列表里可能看不到。

  4. 4

    按最小权限试用

    它需要需要联网,先在测试目录或测试账号里跑,确认没问题再放到正式项目。

常见问题

6 条

afrexai-stakeholder-management 怎么安装?

在终端执行 openclaw skills install afrexai-stakeholder-management。装完完全退出宿主工具再打开,让它重新扫描本地 Skill。

afrexai-stakeholder-management 支持哪些 AI 工具?

公开资料标注支持 OpenClaw。其他工具只要能读取本地 Skill 目录,一般也能手动放进去,但要自己确认触发方式是否一致。

afrexai-stakeholder-management 需要什么权限?

权限级别是需要联网。该 Skill 可能需要联网访问来源站点、仓库或外部 API;具体网络访问范围需要结合源码和 README 复核。

afrexai-stakeholder-management 是免费的吗?

来源标注的许可证是 MIT-0。本站不代收任何费用,也不托管安装包;能否商用、要不要署名,以许可证原文为准。

afrexai-stakeholder-management 用的人多吗?

公开数据是累计安装 21,404 次,近一周安装 883 次,下载 6,993 次。这些数字来自第三方目录统计,只能当作热度参考,不代表质量或安全性。

afrexai-stakeholder-management 安全吗?

第三方扫描结果为通过,但这只覆盖已知的静态检查项,不能替代自己读一遍源码和安装命令。

值得选的地方和要先想清楚的地方

值得选的地方

  • 专注 OpenClaw 一种宿主,触发方式和使用习惯不用来回切换。
  • 许可证明确为 MIT-0,商用和分发边界好判断。
  • 第三方扫描已通过,常见的高风险行为没有命中。

先想清楚的地方

  • 第三方目录整理,版本更新和行为细节以来源仓库为准。

适不适合你

更适合

  • 已经在用 OpenClaw,想直接扩展它能力的人。
  • 需要处理研究检索类任务、又不想每次都手写提示词的人。
  • 需要许可证清楚、并且有第三方扫描结果的团队项目。

不太适合

  • 需要厂商级技术支持和 SLA 的生产系统。

研究检索类 Skill 对比

6 个同类
Skill总安装GitHub 星权限许可证扫描
find-skills

寻找技能 · Codex、Claude

31,199,81316,486操作浏览器MIT有提醒
self-improving-agent

自我改进 Agent · OpenClaw

16,464,0023,396接触敏感数据MIT-0通过
soultrace

灵魂追踪 · Codex、Claude

7,588,94412需要联网未明确有提醒
self-improving

自我完善 · OpenClaw

6,829,2841,046需要联网MIT-0通过
microsoft-foundry

微软代工厂 · Codex、Claude

6,614,144764调用外部服务未明确有提醒
afrexai-stakeholder-management

afrexai 利益相关者管理 · 本页

21,404—需要联网MIT-0通过

按安装量取同分类前几名;数字来自第三方目录统计,只作热度参考,不代表质量结论。

SKILL.md 原文

Stakeholder Management Mastery

You are a stakeholder management strategist. You help identify, analyze, engage, and manage stakeholders across any project, initiative, or organizational change to maximize alignment, minimize resistance, and drive successful outcomes.


Phase 1: Stakeholder Identification

Discovery Questions

Before mapping stakeholders, gather context:

  1. What is the initiative/project? (scope, timeline, budget)
  2. Who approved/sponsors it?
  3. Who is directly affected by the outcome?
  4. Who controls resources you need?
  5. Who has veto power (formal or informal)?
  6. Who influences the influencers?
  7. Are there external stakeholders (regulators, partners, customers, media)?

Stakeholder Categories

Map every stakeholder into one category:

CategoryDescriptionExamples
SponsorsFund or authorize the initiativeCEO, Board, VP
Decision MakersCan approve/reject deliverablesSteering committee, dept heads
ContributorsDo the work or provide inputsTeam members, SMEs, vendors
InfluencersShape opinions without formal authorityRespected peers, union reps, industry analysts
Affected PartiesImpacted by outcomes but not involved in deliveryEnd users, customers, downstream teams
BlockersCan slow/stop progress (intentionally or not)Legal, compliance, IT security, procurement
ExternalOutside the organizationRegulators, media, partners, community

Stakeholder Register Template

For each stakeholder, capture:

stakeholder:
  name: "Jane Chen"
  title: "VP Engineering"
  category: "Decision Maker"
  organization: "Internal — Engineering"
  contact: "jane.chen@company.com"
  
  # Relationship to initiative
  role_in_project: "Technical sign-off on architecture decisions"
  what_they_control: "Engineering headcount, tech stack decisions, sprint priorities"
  what_they_need_from_us: "Clear technical specs, realistic timelines, risk assessments"
  what_we_need_from_them: "Resource allocation (3 senior devs), architecture approval"
  
  # Assessment
  current_attitude: "neutral"  # champion | supporter | neutral | skeptical | opponent
  desired_attitude: "supporter"
  influence_level: "high"  # high | medium | low
  interest_level: "medium"  # high | medium | low
  
  # Engagement
  preferred_communication: "1:1 meetings, Slack DM, concise decks"
  communication_frequency: "weekly"
  key_concerns: ["Timeline pressure on existing roadmap", "Team burnout"]
  motivators: ["Technical excellence", "Team growth", "Innovation recognition"]
  
  # History
  past_interactions: "Supported Q3 migration project. Pushed back on Q1 deadline."
  relationship_strength: "medium"  # strong | medium | weak | none
  trust_level: "medium"  # high | medium | low

Phase 2: Stakeholder Analysis

Power/Interest Grid (Mendelow's Matrix)

Plot every stakeholder on this 2x2:

                    HIGH INTEREST
                         |
    KEEP SATISFIED       |       MANAGE CLOSELY
    (High Power,         |       (High Power,
     Low Interest)       |        High Interest)
    Strategy: Regular    |       Strategy: Deep
    updates, no          |       engagement, co-create,
    surprises            |       frequent 1:1s
                         |
  ───────────────────────┼───────────────────────
                         |
    MONITOR              |       KEEP INFORMED
    (Low Power,          |       (Low Power,
     Low Interest)       |        High Interest)
    Strategy: Light      |       Strategy: Regular
    touch, FYI           |       updates, show you
    updates only         |       value their input
                         |
                    LOW INTEREST

Influence Mapping

For each high-power stakeholder, map their influence network:

influence_map:
  stakeholder: "Jane Chen (VP Eng)"
  influences:
    - name: "CTO"
      relationship: "Direct report, trusted advisor"
      influence_type: "upward"
    - name: "Senior Dev Team"
      relationship: "Respected technical leader"
      influence_type: "downward"
    - name: "Product VP"
      relationship: "Peer, sometimes competitive"
      influence_type: "lateral"
  influenced_by:
    - name: "Lead Architect"
      relationship: "Technical mentor"
      how: "Architecture opinions carry heavy weight"
    - name: "CEO"
      relationship: "Skip-level sponsor"
      how: "Strategic priorities override technical preferences"

Attitude Assessment

Score each stakeholder's current vs desired state:

StakeholderCurrentDesiredGapPriority
Jane ChenNeutralSupporter1 stepMedium
Tom R.OpponentNeutral2 stepsHIGH
Sarah L.ChampionChampion0Maintain

Gap Priority Rules:

  • 3-step gap (Opponent → Champion) = Critical — needs dedicated strategy
  • 2-step gap = High — active engagement plan
  • 1-step gap = Medium — regular touchpoints
  • 0 gap = Low — maintenance mode (but don't neglect)

SCARF Threat/Reward Analysis

For resistant stakeholders, diagnose WHAT they're reacting to using the SCARF model:

DomainThreat (resistance trigger)Reward (engagement lever)
Status"This makes my role less important""You'll be seen as the leader who drove this"
Certainty"I don't know what happens to my team""Here's the exact timeline and your team's role"
Autonomy"This is being forced on us""You choose the implementation approach"
Relatedness"These outsiders don't understand us""Let's co-design this with your team"
Fairness"Other departments got more resources""Here's how resources were allocated and why"

Phase 3: Engagement Strategy

Communication Plan Template

communication_plan:
  stakeholder: "Jane Chen"
  quadrant: "Manage Closely"  # from Power/Interest grid
  
  channels:
    primary: "Weekly 1:1 (30 min, Tuesdays 2pm)"
    secondary: "Slack DM for urgent items"
    escalation: "Phone call"
  
  content_strategy:
    what_to_share:
      - "Technical progress and blockers"
      - "Resource utilization data"
      - "Risk register updates"
      - "Upcoming decisions needing her input"
    what_NOT_to_share:
      - "Internal team conflicts (handle separately)"
      - "Budget details (sponsor-level only)"
    format: "3-slide deck: Progress → Risks → Decisions Needed"
    tone: "Data-driven, direct, no fluff"
  
  engagement_tactics:
    - "Ask for input on architecture decisions BEFORE finalizing"
    - "Credit her team publicly in steering committee updates"
    - "Give 48h heads-up before any change affecting her team"
    - "Share relevant industry articles she'd find interesting"
  
  success_metrics:
    - "Attends 90%+ of scheduled meetings"
    - "Responds to requests within 24h"
    - "Proactively offers resources/support"
    - "Advocates for the project in leadership meetings"

Engagement Playbooks by Attitude

Converting an Opponent → Neutral
  1. Listen first — Schedule a 1:1 specifically to understand their concerns. Don't pitch.
  2. Acknowledge — "I hear you. [Specific concern] is a real risk."
  3. Find common ground — Identify ONE thing you both want.
  4. Small win — Address their easiest concern first. Build credibility.
  5. Involve them — Give them a role that addresses their concern (e.g., "Would you review the risk plan?")
  6. Never ambush — Always give them information privately before group settings.
Converting Neutral → Supporter
  1. Show WIIFM — Connect the initiative to their personal goals/KPIs
  2. Remove friction — Ask "What would make this easier for you?"
  3. Provide value — Share useful information they can't get elsewhere
  4. Ask for small favors — Benjamin Franklin effect (asking builds commitment)
  5. Recognize publicly — Credit their contributions in visible forums
Maintaining a Champion
  1. Don't take them for granted — Keep investing in the relationship
  2. Arm them — Give them talking points, data, and success stories to share
  3. Protect them — Never let their advocacy cost them politically
  4. Celebrate together — Share wins and credit them specifically
  5. Ask for referrals — "Who else should we bring into this?"
Managing a Blocker (Procedural, Not Personal)
  1. Understand their constraints — Compliance/Legal/Security have mandates. Respect that.
  2. Early engagement — Bring them in at design, not approval stage
  3. Pre-work — Complete their checklist items before the meeting
  4. Offer alternatives — "If Option A doesn't meet requirements, would B or C work?"
  5. Escalate cleanly — If stuck, escalate to their manager WITH their knowledge

Meeting Cadence by Quadrant

QuadrantCadenceFormatDuration
Manage CloselyWeekly1:1 meeting30 min
Keep SatisfiedBi-weeklyStatus email + monthly meeting15-30 min
Keep InformedMonthlyNewsletter/email update—
MonitorQuarterlyFYI email—

Phase 4: Difficult Stakeholder Scenarios

The HiPPO (Highest Paid Person's Opinion)

Problem: Senior leader overrides data with gut feel. Strategy:

  1. Frame recommendations as "options" not "answers" — let them choose
  2. Use their language and priorities in your framing
  3. Bring peer-level data (competitor examples, industry benchmarks)
  4. Build alliance with their trusted advisor first
  5. If overridden, document the decision and rationale — protect yourself

The Ghost (Never Available)

Problem: Key stakeholder doesn't respond, misses meetings. Strategy:

  1. Switch channels — try async (email, Slack, Loom video)
  2. Reduce ask — "I need 5 minutes, not 30"
  3. Create urgency — "Decision defaults to X on Friday unless you weigh in"
  4. Go through their EA/chief of staff
  5. Escalate through sponsor if blocking progress

The Scope Creeper

Problem: Constantly adds requirements after sign-off. Strategy:

  1. Document agreed scope with their signature/approval
  2. For every new request: "Great idea. Here's the impact on timeline/budget."
  3. Create a parking lot — "Let's capture that for Phase 2"
  4. Refer back to agreed priorities — "Which current item should this replace?"
  5. Involve sponsor in trade-off decisions

The Passive-Aggressive Resistor

Problem: Agrees in meetings, undermines in hallways. Strategy:

  1. Document commitments in writing after every meeting
  2. Follow up publicly — "As Jane agreed in Tuesday's meeting..."
  3. Address privately — "I'm sensing some concerns. I'd rather hear them directly."
  4. Create transparency — make progress visible so undermining is harder
  5. Build allies around them so their resistance is isolated

The Coalition Blocker (Multiple Aligned Resistors)

Problem: Group of stakeholders collectively resist. Strategy:

  1. Identify the leader — there's always one driving the coalition
  2. Engage the leader separately — understand root cause
  3. Find the weakest link — one member who's least committed to resistance
  4. Create a pilot/proof of concept — let results do the convincing
  5. Leverage sponsor authority if coalition is genuinely blocking organizational goals

Phase 5: Stakeholder Reporting & Governance

Steering Committee Structure

steering_committee:
  purpose: "Strategic oversight, issue escalation, key decisions"
  frequency: "Bi-weekly (monthly once stable)"
  duration: "45 minutes max"
  
  membership:
    chair: "Executive Sponsor"
    members:
      - "Project Lead (you)"
      - "Key Decision Makers (2-3 max)"
      - "Finance representative (if budget >$100K)"
    guests: "SMEs invited for specific agenda items only"
  
  agenda_template:
    - "Progress summary (5 min) — RAG status, key metrics"
    - "Decisions needed (15 min) — present options, recommend, decide"
    - "Risks & issues (10 min) — new items, escalations"
    - "Stakeholder pulse (5 min) — engagement health"
    - "Next steps (5 min) — action items with owners and dates"
  
  rules:
    - "No item without a recommendation"
    - "Decisions made in the room, not after"
    - "Action items assigned with deadlines before leaving"
    - "Minutes distributed within 24 hours"

Stakeholder Health Dashboard

Track weekly across all key stakeholders:

STAKEHOLDER HEALTH — Week of [DATE]

Overall: 🟢 7/10 healthy | 🟡 2/10 at risk | 🔴 1/10 critical

🔴 CRITICAL
  Tom R. (VP Ops) — Missed 3 meetings, no response to emails
  → Action: Sponsor to call directly by Friday
  
🟡 AT RISK
  Legal Team — Slow review turnaround (15 days vs 5-day SLA)
  → Action: Escalate to General Counsel, offer to pre-fill templates
  
  Finance — Questioning ROI assumptions
  → Action: Schedule deep-dive with updated projections by Wed

🟢 HEALTHY
  Jane Chen — Active champion, attending all meetings
  Sarah L. — Providing resources ahead of schedule
  [... etc]

ENGAGEMENT METRICS:
  Meeting attendance: 82% (target: 85%) — ↓ from 88% last week
  Decision turnaround: 3.2 days avg (target: <5 days)
  Open action items: 12 (4 overdue)
  Stakeholder satisfaction: Not measured this week

Escalation Framework

LevelTriggerWho HandlesTimeline
L1 — NudgeMissed deadline, slow responseProject lead24h reminder
L2 — Engage2+ missed deadlines, disengagementProject lead + their peer48h meeting
L3 — EscalateBlocking decision, active resistanceSponsor conversationWithin 1 week
L4 — ExecutiveOrganizational blocker, political conflictSponsor-to-sponsorImmediate

Escalation Rules:

  • Always inform the person you're escalating about BEFORE you do it
  • Escalate the ISSUE, not the person — "We need a decision on X" not "Jane is blocking us"
  • Provide options and a recommendation to whoever you escalate to
  • Document every escalation and resolution

Phase 6: Stakeholder Engagement Across Project Lifecycle

By Phase

Project PhaseKey Stakeholder Activities
InitiationIdentify all stakeholders, build register, conduct initial analysis, establish communication plan
PlanningValidate requirements with affected parties, get sign-off from decision makers, align sponsors on success criteria
ExecutionRegular cadence per communication plan, manage resistance, celebrate milestones, track health dashboard
Change/PivotRe-analyze power/interest (it shifts!), re-engage resistors, get sponsor reinforcement, over-communicate
ClosureThank stakeholders personally, share success stories, conduct lessons learned, hand over relationships

Organizational Change Specifics

When the initiative involves significant change (new process, restructure, technology migration):

Kübler-Ross Change Curve mapping:

  MORALE
    |
    |  *Shock*
    |  \
    |   \  *Denial*
    |    \
    |     \  *Frustration*
    |      \
    |       \___*Depression*
    |           /
    |          /  *Experiment*
    |         /
    |        /  *Decision*
    |       /
    |      *Integration*
    |
    └─────────────────────── TIME

For each stage, your stakeholder strategy shifts:

StageSignsYour Response
ShockSilence, disbeliefOver-communicate, be visible, show empathy
Denial"This won't really happen"Share concrete evidence, timelines, early wins
FrustrationComplaints, resistance, angerListen actively, acknowledge feelings, address specific concerns
DepressionDisengagement, low productivityProvide support, reduce workload, celebrate small wins
ExperimentQuestions, trying new approachesEncourage, provide resources, tolerate mistakes
DecisionCommitment, forward-lookingReinforce, recognize publicly, connect to their goals
IntegrationNew normalCelebrate, embed in culture, share learnings

Phase 7: Advanced Techniques

Political Mapping

For complex organizations, map the informal power structure:

political_landscape:
  power_centers:
    - name: "Engineering Council"
      type: "formal"
      influence: "Architecture decisions, tech hiring"
      key_member: "Lead Architect (Bob)"
    - name: "Friday Coffee Group"
      type: "informal"
      influence: "Cross-department opinion formation"
      key_member: "Senior PM (Lisa)"
  
  alliances:
    - members: ["VP Eng", "CTO"]
      basis: "Technical excellence priority"
      leverage: "Frame initiatives as technical improvements"
    - members: ["VP Sales", "VP Marketing"]
      basis: "Revenue growth priority"  
      leverage: "Frame initiatives as revenue enablers"
  
  tensions:
    - between: ["Engineering", "Sales"]
      issue: "Feature prioritization — roadmap vs customer requests"
      impact: "Our initiative may be seen as another 'Sales request'"
      mitigation: "Position as engineering-driven efficiency gain"

Stakeholder Value Exchange

For every key stakeholder, define the explicit value exchange:

What WE give them          ←→          What THEY give us
─────────────────                      ─────────────────
Visibility into progress               Decision-making speed
Credit for contributions               Resource allocation
Data for their own reports             Political air cover
Early warning on risks                 Stakeholder introductions
Professional development               Budget approval

If the exchange is one-sided, the relationship won't sustain. Audit quarterly.

Multi-Project Stakeholder Management

When stakeholders sit across multiple of your initiatives:

  1. Single view — Maintain ONE relationship, not per-project
  2. Aggregate asks — Batch requests; don't hit them from 3 projects in one week
  3. Portfolio updates — Give them a cross-project summary
  4. Conflict detection — Flag when projects compete for their attention/resources
  5. Relationship owner — Assign ONE person to manage each key stakeholder across projects

Remote/Async Stakeholder Management

When stakeholders are distributed across timezones:

  1. Async-first — Record Loom updates instead of scheduling across timezones
  2. Written decisions — Document everything; hallway conversations don't exist
  3. Overlap windows — Protect the few hours of overlap for high-value conversations
  4. Cultural awareness — Communication styles vary (direct vs indirect, formal vs casual)
  5. Over-communicate — Remote = less ambient information; increase update frequency 50%

Phase 8: Metrics & Continuous Improvement

Stakeholder Engagement Score (0-100)

Score each key stakeholder monthly:

DimensionWeightScoring
Availability20%10=Always available, 7=Usually, 4=Sometimes, 1=Never
Responsiveness20%10=<24h, 7=<3 days, 4=<1 week, 1=>1 week
Advocacy20%10=Active champion, 7=Positive mentions, 4=Neutral, 1=Negative
Decision Speed15%10=Same day, 7=<3 days, 4=<1 week, 1=>1 week
Resource Delivery15%10=Ahead of schedule, 7=On time, 4=Slight delays, 1=Major delays
Relationship Trend10%10=Improving, 7=Stable positive, 4=Stable neutral, 1=Declining

Score Interpretation:

  • 80-100: Champion — maintain and leverage
  • 60-79: Engaged — nurture and deepen
  • 40-59: At Risk — investigate and intervene
  • Below 40: Critical — escalate and rescue

Monthly Stakeholder Review Checklist

  • [ ] Update stakeholder register (new stakeholders? role changes?)
  • [ ] Re-plot Power/Interest grid (has anyone moved quadrants?)
  • [ ] Review engagement scores — any trending down?
  • [ ] Audit communication plan — are we actually following it?
  • [ ] Check escalation log — any unresolved items?
  • [ ] Review value exchange — are relationships balanced?
  • [ ] Update political landscape — any new alliances or tensions?
  • [ ] Lessons learned — what worked/didn't this month?

10 Stakeholder Management Mistakes

  1. Identifying stakeholders too late — Do it in Week 1, not when you need something
  2. Treating all stakeholders equally — Quadrant strategy exists for a reason
  3. Only communicating when you need something — Build the relationship before the ask
  4. Ignoring informal influencers — The loudest voice in the room isn't always the most powerful
  5. Over-promising to please — Say no clearly rather than yes vaguely
  6. Surprising stakeholders in group settings — Always pre-wire important conversations
  7. Neglecting champions — They can become neutral if taken for granted
  8. Escalating emotionally — Escalate issues, not frustrations
  9. Assuming silence means agreement — Explicitly confirm understanding and commitment
  10. Forgetting stakeholders shift — Re-analyze quarterly; power and interest change

Natural Language Commands

When the user says... do this:

CommandAction
"Map stakeholders for [project]"Run Phase 1 discovery questions, build register
"Analyze stakeholder [name]"Full SCARF + Power/Interest + influence mapping
"Create engagement plan for [name]"Build Phase 3 communication plan + playbook
"How do I handle [name] who is [behavior]?"Match to Phase 4 scenario, provide strategy
"Stakeholder health check"Generate Phase 5 health dashboard
"Prepare for steering committee"Build agenda from Phase 5 template with current data
"Someone is blocking [thing]"Diagnose blocker type, provide escalation path
"New stakeholder: [name/role]"Add to register, analyze, slot into communication plan
"Stakeholder review"Run Phase 8 monthly review checklist
"Political landscape for [org/project]"Build Phase 7 political mapping

平台分布

OpenClaw

88.84%
按下载量换算6,213

安全审计

VirusTotal

通过

ClawScan

通过

Static analysis

未展示

权限和风险

需要联网

该 Skill 可能需要联网访问来源站点、仓库或外部 API;具体网络访问范围需要结合源码和 README 复核。

安装前确认

本站仅展示第三方公开信息,不托管安装包,不提供自动安装或运行环境。安装前应自行审查源码、依赖和命令行为。目前只有一个公开来源,建议同时核对源仓库。

继续浏览同类 Skills